Sun / Oracle Cables
A small number of power cords from one specific manufacturer may develop a leakage current condition over an extended period of time (typically >4 years). This leakage current is internal to the female plug of the cord. If excessive enough, this leakage current could lead to a trip condition of the rack PDU or external circuit breaker. In a more severe case, there is the possibility of damage due to a thermal event. **It is very important to have the correct power cables in your data center for Sun / Oracle equipment.** ### **How do I know if I have these power cords?** Only the following power cords that have the C19 connector as shown are suspected: **AC Input Power CordsPart NumbersDescriptionC19 Connector** 180-2004-01 and -02 16A, International, IEC 309 to IEC 320 C19, 4.0M 180-2005-01 and -02 20A, Americas, NEMA L6-20P to IEC 320 C19, 4.0M 180-2060-01 and -02 20A, Watertight IEC 309 to IEC 320 C19, 4.0M 180-2061-01 and -02 16A, Watertight IEC 309 to IEC 320 C19, 4.0M **Rack Power Distribution Unit (PDU) to Platform Power CordsPart NumbersDescriptionC19 Connector** 180-2095-01 20A, IEC 320 C19 to IEC 320, 1.5M 180-2096-01* 20A, IEC 320 C19 to IEC 320, 2.0M 180-2097-01* 20A, IEC 320 C19 to IEC 320, 2.5M 180-2099-01* 20A, IEC 320 C19 to IEC 320, 3.5M * Added February 2015 **Shown below is the label on the suspected power cords. Only power cords with an Oracle Code of 0001205, week 01 year 04 to week 26 year 11 may be affected.Figure 1: Label Detail** If the label is missing the power cords can be identified by the identifying mark which is located on the female end of the power cord, as shown in the picture below. **Figure 2: Vendor Identifying Mark** If your Sun Rack 900/1000 is configured with 2 vertical rows of up to 6 power strips on either side of the rack you should replace the Rack PDU to Rack Power Strip power cords. If your Sun Rack 900/1000 does not have this configuration you do not need to replace the Rack PDU to Rack Power Strip pow
